FACILITY ASSESSMENT GUIDE

Can an existing facility support a cleanroom?

A practical owner guide to evaluating ceiling height, HVAC, electrical, utilities, exhaust, access, workflow and expansion before converting an existing space.

Sometimes. The answer depends on far more than available square footage.

Seven conditions to investigate early

Clear Height & Structure

Ceiling, plenum and structural requirements.

HVAC Capacity

Air volume, conditioning and pressure strategy.

Electrical & Utilities

Available service, equipment loads and process utilities.

Exhaust

Required exhaust pathways and discharge.

Access & Logistics

Equipment movement and construction access.

Workflow

Personnel and material movement.

Do not design around an unknown building.

Evaluate the Facility